Quality
Quality Control Process
Level 1
QC Inspection Process
Packaging inspection
Check package condition forany sign ofdamage
Documents Verification
Verify the supplier's OQC report
Take a photo for record
Take photos of the received package (parts, labels, and packaging)
Requirement Verification
Verify whether the received parts are consistent with the PO.
Record and Receive
Record all the information and Photos onSystem and Internal Database
Storage Rack
The parts will be placed on the positioning rack for product warehousing.
Level 2
IEC standard inspection
PO/SO Requirement Verification
Verify whether the received information is consistent with PO and SO.
Parts Label Verification
Parts Label will beverified and comparedon Internal database
Perform Sampling Visual Inspection
Carry out sampling inspection (marking, leads, solder balls, surfaces and quantity)
Dimension Checking
The part dimensions will be measured according to the OQC report.
Take a photo for record
Take photos of the received package (parts, labels, and packaging)
Pin Surf. Treat. Eval. (XRF)
Surface and ScrapeTest will be performed
Solderability Test
Parts with over 2years Date code
Radiographic Inspection (X-ray)
Verify Internal Component construction ( Non-destructive)
RoHS Lead Surface Eval.
Verify whether the pins comply with RoHS regulations
Electrical performance test
Verify the electrical performance reliability of parts
Record and Receive
Record all the information and Photos onSystem and Internal Database
Storage Rack
The parts will be placed on the positioning rack for product warehousing.
